02 · Space Force · Scope
Ground Control
00 ·

Prepare evidence for Ground Control review.

First evidence record within 21 days of access. Re-runs in a single business day.

This is the intake shape. Send these answers through the evidence intake or to email@planisphere.ooo, and we can map the next review-ready evidence record.

01 ·

Tool deployment inventory.

What runs in your enclave.
  • How many Ground Control instances are under audit? Per-instance grades are emitted, not a deployment average.
  • Which environments? Production, staging, evaluation — name each. The evidence record pins the environment in ATTESTATION.json.
  • Hosting shape. On-prem, single-tenant cloud, multi-tenant SaaS. The measurement engine runs in-enclave on customer hardware in all three.
  • Existing probe sets. If you already maintain one, we extend it. If not, we ship a synthetic set for Ground Control.
02 ·

Cadence & turnaround.

First record, repeat records, drift comparison.
  • First record. Within 21 days of access — scoping, probe-set delivery, in-enclave run, evidence sign-off.
  • Re-runs. Single business day once the engine is pinned. The record's engine.version is recorded so deltas are explained, not just measured.
  • Drift records. Pair two records and emit a delta. Drift is named, not asserted.
03 ·

Compliance controls to include.

The regulator's requirement row — pre-write the answer.

Tell us which controls and requirements should land in this evidence record. Common picks:

NIST AI RMF · OMB M-25-21/22 · ISO/IEC 42001 · FIPS 140-3 · HIPAA · FERPA · FRE 702 · ABA Model Rules.

Full control set lives at register 09.

04 ·

Next step.

One email and we're scoping.